Menu
Washingtoner
  • Home
  • Health
  • Technology
  • Artificial Intelligence
  • Real Estate
  • Entertainment
  • Non-profit
  • Business
  • Longevity
Washingtoner

Spokane: Impacts For Final Stretch of Construction Season
Washingtoner/10335491

Trending...
  • Pebble Photo Booths Brings Modern Photo Experiences to Vancouver, Washington
  • Congressman Chuck Edwards (NC-11) Presents ReadyCommunities Partnership 2026 National Service Award to Local Businessman / US Air Force Veteran
  • Cress Creeks Farm Opens Fall Corn Maze and Baby Lamb Hayride Experience in Ellijay, Georgia
~ Spokane City is continuing its efforts to maintain and preserve the decks of four bridges, while also beginning a new project on Washington Street. The city's Communications Manager, Kirstin Davis, has urged drivers to plan ahead and be prepared for frequent traffic changes as these necessary projects take place.

Starting on Monday, September 21st, crews will begin resurfacing the northbound lanes of the Greene Street Bridge over the Spokane River. This phase of the project will involve replacing deteriorating concrete and repairing or replacing deck joints. As a result, northbound Greene Street will be closed with a detour in place and southbound traffic will be reduced to one lane. The closure is expected to last until approximately November 15th.

Drivers can expect significant slowdowns in this area and are encouraged to use alternate routes if possible. Local access on Greene Street will still be available between Carlisle Avenue and Ermina Avenue.

More on Washingtoner
  • Santa Your Way Announces Official 2026 Q4 Holiday Tour: Booking Open For Santa, The 5-star Grinch, And Dual Character Experiences Nationwide
  • Put Your Herd on Your Phone: Kiko Nation Makes Livestock Management Simple
  • Future Intelligence Think Tank Surpasses 1,000 Members Exploring Human and Artificial Intelligence
  • Gary Bernstein Expands Media Leadership Role With Senior Strategic Advisor Appointment To Blacksun Private Equity
  • Headline: House of Nova Paints Every Face in Gold at New York Fashion Week

In addition to the Greene Street Bridge project, crews will also begin work on the Havana Street Bridge starting on Monday, September 21st. This project involves installing a polyester concrete overlay and repairing deck joints. Havana Street will be closed between Broadway Avenue and Mission Avenue for the duration of this project, which is expected to be completed by October 16th.

Drivers traveling northbound will be detoured at Broadway Avenue, while those heading southbound will be detoured at Mission Avenue. These detours are necessary for crews to safely complete their work over railroad tracks.

Another project that drivers should be aware of is the grind and overlay project on Washington Street between 8th Avenue and 3rd Avenue. This work is set to begin on Tuesday, September 22nd and includes curb ramp replacements for ADA accessibility, stormwater system upgrades, and replacement of a water system distribution main.

More on Washingtoner
  • Can Government Operate Better Through Innovation?
  • Michael H. Kaplan Advocates for Seriously Injured Colorado Workers Who Need In-Home Care
  • Gravis Law Named in the 2026 Inc. 5000 List
  • Gravis Law Welcomes Purcell Law, Expanding Family Law Services in the Tri-Cities
  • Spokane: City to Temporarily Close Pedestrian Access to Browne St Viaduct

As a result of this project, Washington Street will be closed between Sumner Avenue and 7th Avenue starting on Monday, September 21st. The curb lanes on Washington Street between 8th Avenue and 6th Avenue will also be closed, as well as 8th Avenue between McClellan Street and Washington Street. Drivers can expect significant slowdowns in this area, especially near medical facilities and Lewis & Clark High School.

Local access will still be maintained for businesses in the area. The project has an accelerated construction schedule and is expected to be completed by the end of October.

For more information on these projects and current obstruction information impacting drivers in the city, please visit the construction webpage. Images of the Havana Street Bridge Deck Overlay project and the S. Washington Street project are also available for reference.

The City of Spokane is working diligently to improve its infrastructure while minimizing disruptions for drivers. Drivers are reminded to slow down for everyone's safety and make an extra effort to support businesses impacted by these necessary projects.

Filed Under: Government, City

Show All News | Disclaimer | Report Violation

0 Comments
1000 characters max.

Latest on Washingtoner
  • International Society of Medical AI Convenes Global Faculty in Florence for ISMAI 2026
  • Boston Industrial Solutions Introduces Personalized Printing Training
  • Century Fasteners de Mexico Exhibiting at the 2026 Automotive & Aerospace Nearshoring Summit
  • Spokane: Funding Available for Tourism and Culture Investment Grants
  • Retell AI White Label Platform for Agencies Launched by VoiceAIWrapper, With Branded Client Portals and No Per-Minute Markup
  • FOCUS Names Mark Phillips Senior Vice President of Business Development
  • Notaron Expands Online Notarization Access Following Wisconsin Approval
  • Wings Air Helicopters Selected to Support VIP Transportation for Resorts World in New York
  • Scoop Social Co. Brings Its Signature Mobile Dessert Experience to Houston This October
  • Spokane: Construction Will Require Temporary Browne Street Lane Reductions
  • The Social Capital Revolution Comes to Phoenix!
  • Spokane: Flags Lowered for Mayor Tim Verzal
  • Lawsuit Alleges American Deli Food Caused Severe Illness, Acute Kidney Failure, And Eight-day Hospitalization
  • FBI/DoW plot uncovered to hurt Trump/Vance through encouraged "widespread" cybersecurity breaches and racketeering theft of $80m in USDA payments
  • City of Tacoma Aligns Parking Rates and Facilities for Downtown Parking Network Effective October 13
  • Bettingbladet releases H1 2026 report on the Swedish online gambling market
  • Garage door installation or repair in Minnesota? Which makes more sense for your family?
  • Tacoma: Application for 2027 Community Arts Projects Funding Now Available
  • Haven Treatment Center Now In-Network Partnership with ComPsych, Expanding Access to Youth Health
  • Tacoma: OMWBE Certification 201 Workshop on September 28
_catLbl0 _catLbl1

Popular on Washingtoner

  • Popular AI planner Voiset launches version 2.0 and enters MENA at LEAP 2026 with full Arabic support - 241
  • Diginyze eCommerce ERP Module Creates Single Source of Truth for Enterprise Operations - 161
  • Continuous You Foundation Opens Applications For A 100-year Artist Grant - 142
  • 3ptechies Partners with Coolmuster to Give Away Data Recovery Software Licenses - 135
  • Break the Resume Mold: Career Valet Changes How Executives Hunt for Jobs - 132
  • Tacoma: Applications Now Being Accepted for a Position on the Planning Commission - 130
  • DuoKey launches the World's First Agentic Crypto Agility Platform - 122
  • Tacoma: Hylebos Bridge Closed Today for Maintenance Work - 120
  • Dr. Pen Official Introduces Advanced Microneedling Technology for Precision Skincare at Home
  • Marti Reeder Ranked Among Washington State's Top Real Estate Brokers by RealTrends Verified

Similar on Washingtoner

  • Can Government Operate Better Through Innovation?
  • Spokane: City to Temporarily Close Pedestrian Access to Browne St Viaduct
  • Tacoma: Applicants Sought for the Audit Advisory Board
  • City of Spokane Announces New Tools, Resources to Support Fire Recovery and Rebuilding
  • Tacoma Residents Invited to Turn Recycled Glass Into Art Through New Pilot Program
  • Spokane: Funding Available for Tourism and Culture Investment Grants
  • Spokane: Construction Will Require Temporary Browne Street Lane Reductions
  • Spokane: Flags Lowered for Mayor Tim Verzal
  • FBI/DoW plot uncovered to hurt Trump/Vance through encouraged "widespread" cybersecurity breaches and racketeering theft of $80m in USDA payments
Copyright © 2026 washingtoner.com | Terms of Service | Privacy Policy | Contact Us | Contribute